Sr. No. Description of Works Client Start End
1 Al Aballah School rehabilitation Save The Children Organization 2004 2004
2 Construction of a laboratory for Medicine Collage UN 2006 2006
3 Construction of Al-Ferzdaq Secondary School In Al Qurna UN 2006 2006
4 Rehabilitation of the roofing of Arts Collage Government Of Basrah 2006 2006
5 Construction of Civil Engineering department building in Bab Al Zubair SOC 2006 2007
6 Construction of Dormitories Thi-Qar University 2007 2007
7 Construct of AL_Hurria Diesel Power Plant 62MW ( Wartsila10x6.2 MW). Ministry of Industry 2007 2007
8 Al Furat River stone laying Water resources directorate 2008 2008
9 Al Habanya Base projects Areebel 2009 2009
10 Construction of Service & administrative Buildings for new Maysan refinery Maysan refinery 2009 2009
11 Construction of MCC Building for AL_ Qudes Power State company for industrial design 2009 2009
12 Tunnel excavation for the sport city feeding pipe Youth Ministry 2011 2011
13 Al Fyhaa bridge rehabilitation Road and bridges directorate of Basrah 2011 2012
14 Construction of concrete cooling towers with different capacities at the South Refineries Co. site State Company for Industrial Design 2011 2012
15 Supply concrete for SRC projects South Refineries Company 2013 2013
16 Construction of water treatment Unit with capacity of ( 2000m3/day ) at the SRC State Company for Industrial Design 2013 2014
17 Implementation of Water Treatment plant 10,000m3/h for Basra Sport City Ministry of Sports 2013 2014
18 Supplying and install 4 units of water treatment for Hay Al Hussain Water project in Basrah, capacity of each unit is 400 m3/h Basra Water directorate 2016 2016
19 Supplying and install 4 unit of water treatment for Shat Al Arab Water project in Basrah, each unit capacity is 400 m3/h Basra Water directorate 2015 2016
20 Design and construction of Square shoot for 10th battalion in Nasryah Corps of Engineers 2015 2016
21 Rehabilitation of al garage pump station and construction the Administration buildings, Service buildings and generator room ,Site works, Civil works for sewage collecting tank and Warehouse shed Basra sewer directorate 2015 2016
22 Supply material, equipment and labors to construct a complete packaged sewage treatment plant and standby generator suitable for a population equivalent of 50,000 people as in the design drawings and the specification Basra sewer directorate 2015 2016
23 Design and construction of Al-Sabla canal of lining and the work is including, excavation, dewatering and pouring concrete Ministry of Water Resource 2016 2017
24 The installation of 11KV, 22 KV and 33KV, substations. Our services also include CT, PT & LA, Isolators, gantries and towers JCCI/Babil 2016 2017
25 Construction of Emergency building in Azubair Hospital in Basrah Governorate (2000m2) with 2 stories, this project including Excavation and filling, and concrete works for fundation, columes, slabs, … ( more than 2000m3 reinforced concrete) Basrah support rebuild and services committee 2016 2017
26 Equipment's Installation of Liquefied Petroleum Gas Unit/ at the South Refineries Co South Refineries Company 2017 2017
27 Rehabilitation of Khalid Bridge at Basra city (consist of support, pilling, Lifting Ministry of Housing & Construction 2017 2017
28 Supply and installation of 730 concrete pile General Company for South Oil Refineries 2017 2017
29 Implementation of the earthworks for the Fluidized Catalytic Cracking project (4 million m3 ) at the site of south refineries State Company for Industrial Design 2016 2017
30 Steel Structure for AL-Shabah printing house Ministry of Industry 2016 2017
31 Rehabilitation of ALBUFRAJ Bridge Directorate of Roads and Bridges 2016 2017
32 Fluidized Catalytic Cracking-FCC (Extensional Adjacent Area) State Company for Industrial Design 2016 2017
33 Installation of Mechanical, Electrical and Instrument works such
1. Static Equipment Installation
2. Rotary Equipment Installation
3. Piping Installation
4. Valves Installation
5. Supports
6. NDT
7. Hydro-Test
8. Sand Blast
9. Painting
10. Flushing
11. Pre commissioning
12. Cable Installation
13. LV Transformer
14. ML Transformer
15. Electrical Equipment Installation
16. Electronic Equipment Installation
17. Power Panels
18. Power Generator Installation
Petrofac International (UAE) LLC . 2017 2018
34 Providing all the requirement and manpower to provide 125m3 + 175 m3 of Fire Protection Concrete Sajer 2017 2018
35 First Commercial and Production (FCP) Garraf Oil and Gas project in Southern Iraq. The project includes the EPC of storage tanks and the construction of piping systems, process units, LP & ATM. The current FCP Garraf project is designed for 100kbpd oil from the Mishrif formation utilizing two (2) oil processing trains of 50 kbpd capacity each. Lakeshore Toltest Corporation 2017 2018
36 Design and Engineering, Procurement, Construction and commissioning of Basrah Crude Distillation No.4 Unit, LPG Unit and Boiler TECHNO EXPORT 2018 2018
37 Installation of prefabricated steel structural buildings for LCR ,LER ,Gurd House and four guard towers each one consist of three stories. The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system. EMIL 2018 2019
38 Installation of prefabricated steel structural building for LCR ,The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system EMIL 2018 2019
39 Providing various required Scaffolding along with required skilled manpower, Scaffolding materials. The scope will start from mobilization/demobilization of skilled & experienced manpower, required scaffolding materials, equipments, tools & tackles to COMPANY site for erecting or dismantling of Scaffolding as per COMPANY Scaffolding procedures and permit requirements and the types of scaffolding is including but not limited to the following :
1. Supply and install Tube and Coupler cantilever scaffolding type.
2. Supply and Install Tube and Coupler suspendable scaffolding Type.
3. Supply and install Tube and Coupler mobile Scaffolding type.
4. Supply and install Tube and Coupler Tower scaffolds type.
Bp Iraq N.V 2018 2019
40 Installation of Mechanical, Electrical and Instrument works such as vessels, pumps, electrical panels, .. Etc. STX/SOC 2018 2019
41 Installation of Piping and Pipeline ZFOD 2017 2020
42 Mechanical,Electrical,Insrtrumentationa and Piping works at Badra Oil Field Petrofac 2017 2020
43 Provisions of competent, experienced and a professional manpower and equipment/vehicle as further described in this scope of service to support:
• Pre commissioning
• Commissioning
• Maintenance
• Shutdown activities
• Scaffolding Services
Petrofac International (UAE) LLC 2018 2020
44 Water Station supply & Installation Haione Ind Co.Ltd. 2020 2020
45 Site Preparation Work Hyundai Livert 2021 2021
46 Equipment Supply Haione Ind Co.Ltd. 2021 2021
47 Site Preparation for Laydown area Hyundai Engineering 2021 2021
48 T-Wall & Site Preparation for Camp Area Hyundai Livert 2021 2021
49 Rental Caravan Supply Haione Ind Co.Ltd 2021 2021
50 Concrete Slab for water Station ( Supply & installation) Haione Ind Co.Ltd 2021 2021
51 Supply of Material (Soil) Hyundai Engineering 2021 2021
52 Asphalt Road Paving Work For Temporary Facilities Hyundai Livert 2021 2021
53 Supply & Installation of Masque Tent Hyundai Engineering 2021 2021
54 Supply of Well graded granular (16mm-50mm) Hyundai Engineering 2021 2021
55 Geogrid Mixing & Installation Work Hyundai Engineering 2021 2021
56 RO tank foundation Work Haione Ind Co.Ltd. 2021 2021
Sr. No. Description of Works Client Start End
1 Water pipe installation to Al Mayahe Street in Abu Al Khaseeb Save The Children Organization 2004 2004
2 Pipeline installation (28 in) from Sweeb station to Majnoon oil field SOC 2006 2007
3 Construction of Service & administrative Buildings for new Maysan refinery Maysan refinery 2009 2009
4 Installation of Hydrogenation unit pressure plants at South Refinery Co.site State Company for Industrial Design 2011 2012
5 Construct of Baiji GasTurbine power plant 6x160MW sgt5-pack2000E siemense Ministry of Electricity 2012 2012
6 Rehabilitation of pumps, motors, generators, power and control cables, and electrical panels Water directorate-Basra 2013 2014
7 Design and construction of water pipe line at Al-Meshraq Area Mott MacDonald 2013 2014
8 Paving and repair of Al Tamimiyah Road ,including excavation, filling, grading, compacting, leveling and paving with asphalt, of 10Km length. The works includes concrete works for intersections of 25cm depth and total 1400 m3. Ministry of Municipalities and Public Works 2013 2014
9 Construction of water treatment Unit with capacity of ( 2000m3/day ) at the SRC State Company for Industrial Design 2013 2014
10 Implementation of Water Treatment plant 10,000m3/h for Basra Sport City Ministry of Sports 2013 2014
11 Excavation Laying of pipeline (1000 mm. Dia.x18KM.L) from pump station to Water Water pipe feeding (900 mm) Dia, 18 km length for Basra Sport city Ministry of Sports 2013 2014
12 Ductile Pipeline,22 Km length in AL-Nasiriya Industrial City Ministry of Industry 2013 2014
13 Supply material, equipment and labors to Excavation, supplying and Laying sewer network piping and manholes for Hay Al Hussain Basra sewer directorate 2015 2015
14 Supply and install difference size of pipes, Replace unsuitable materials, Reinstatement and other works for successfully finishing project Basra Water directorate 2015 2015
15 Design and construction of a pump system with piping for KHOR AL ZUBYAR harbor. Iraqi tankers co. 2015 2015
16 Fabrication, welding and laying pipe line and pipe fittings at Majnon Oilfield – Basra - Iraq Shell - Iraq 2015 2015
17 Supply material, equipment and labors to supplying and install (INLET CHAMBER , TRASH SCREEN, LIFTING CRANES, SUBMERSIBLE PUMPS, PIPING AND FITTINGS ) , including all necessary buildings and fences. Basra sewer directorate 2015 2015
18 Install the water pipes network containing supply and install difference size of pipes, Replace unsuitable materials and other works for successfully finishing project Basra Water directorate 2014 2015
19 Supplying and install 4 units of water treatment for Hay Al Hussain Water project in Basrah , capacity of each unit is 400 m3/h Basra Water directorate 2016 2016
20 Maintenance and Widening Bradhyaa Water Project including supply and install different sizes of pipes, maintenance all water pumps, filters, valves and other works for project success Basra Water directorate 2015 2016
21 Supplying and install 4 unit of water treatment for Shat Al Arab Water project in Basrah , each unit capacity is 400 m3/h Basra Water directorate 2015 2016
22 Rehabilitation of al garage pump station and construction the Administration buildings, Service buildings and generator room, Site works, Civil works for sewage collecting tank and Warehouse shed Basra sewer directorate 2015 2016
23 Supply material, equipment and labors to construct a complete packaged sewage treatment plant and standby generator suitable for a population equivalent of 50,000 people as in the design drawings and the specification Basra sewer directorate 2015 2016
24 Piping Process networks for AL-Shaiba Refinery including : sandblasting , welding , NDE ,PWHT Thermal Insulation, cladding and coating South Refineries 2015 2016
25 Line Polyethylene water pipeline network in the 14 Tamoze street size 500 mm and 450 mm Basra Water directorate 2016 2017
26 Fabrication, welding and laying pipe line with installing manifold and pipe fittings at Majnon Oilfield Shell - Iraq 2016 2017
27 The installation of 11KV, 22 KV and 33KV, substations. Our services also include CT, PT & LA, Isolators, gantries and towers JCCI/Babil 2016 2017
28 Equipment's Installation of Liquefied Petroleum Gas Unit/ at South Refineries Co South Refineries Company 2017 2017
29 Hydro test and Pneumatic test at Badra CPF Petrofac 2018 2018
30 Installation of Mechanical, Electrical and Instrument works such
1. Static Equipment Installation
2. Rotary Equipment Installation
3. Piping Installation
4. Valves Installation
5. Supports
6. NDT
7. Hydro-Test
8. Sand Blast
9. Painting
10. Flushing
11. Pre commissioning
12. Cable Installation
13. LV Transformer
14. ML Transformer
15. Electrical Equipment Installation
16. Electronic Equipment Installation
17. Power Panels
18. Power Generator Installation
Petrofac International (UAE) LLC . 2017 2018
31 Fabrication, welding and installing flow line and piping system will all pipe fittings at Hamar Mushrif gas compressor station Basra - Iraq ENI 2017 2018
32 First Commercial and Production (FCP) Garraf Oil and Gas project in Southern Iraq. The project includes the EPC of storage tanks and the construction of piping systems, process units, LP & ATM. The current FCP Garraf project is designed for 100kbpd oil from the Mishrif formation utilizing two (2) oil processing trains of 50 kbpd capacity each. Lakeshore Toltest Corporation 2017 2018
33 The project is EPCC of the export pipeline for Garraf Contract Area to export the crude oil from the FCP at Garraf to Ahdep Pipeline which exports the crude oil further to the government depot at Nasseryah city.The project consists of 8km of 18" pipeline with the related facilities such as fiber optic, leak detection system, launching and recieving stations, 2 block valve stations and the required tie-ins. Petronas Caligari Iraq Holding B.V. 2017 2018
34 Scope of Work in KAZ area as follow:
• Installation and hook-up of gas treatment facility.
• Erection of ME&I equipment and structures
• Tie-ins in gas treatment facility existing
• Interconnecting to gas treatment facility • Installation of power and control cables.
• Installation of piping system with all insulation works
KBR 2017 2018
35 Complete of the external evaluation of the crude oil export pipeline in Bazargan – ALFAO State Company for Inspection &Engineering Rehabilitation ( SIER ) 2017 2018
36 Design and Engineering , Procurement , Construction and commissioning of Basrah Crude Distillation No.4 Unit , LPG Unit and Boiler TECHNOEXPORT 2018 2018
37 Hvac Works For Control & Substation Buildings :Supply And Install Galvanzied Steel With Corosion Resistance Coating And Insect Screen, Galvanized Steel Frame, Blade & Accesoreis. Stainless Steel Frame, Blade & Accessories, Low Leakage Type, Amca Class Ii (Min.) CCC/Shell 2018 2019
38 Installation of prefabricated steel structural buildings for LCR ,LER ,Gurd House and four guard towers each one consist of three stories. The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system. EMIL 2018 2019
39 Heat Excahnger Rehablitation Service Bp Iraq N.V 2017 2019
40 Installation of prefabricated steel structural building for LCR ,The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system EMIL 2018 2019
41 Providing various required Scaffolding along with required skilled manpower, Scaffolding materials. The scope will start from mobilization/ demobilization of skilled & experienced manpower, required scaffolding materials, equipments, tools & tackles to COMPANY site for erecting or dismantling of Scaffolding as per COMPANY Scaffolding procedures and permit requirements and the types of scaffolding is including but not limited to the following:
1. Supply and install Tube and Coupler cantilever scaffolding type.
2. Supply and Install Tube and Coupler suspendable scaffolding Type.
3. Supply and install Tube and Coupler mobile Scaffolding type.
4. Supply and install Tube and Coupler Tower scaffolds type.
Bp Iraq N.V 2018 2019
42 Installation of Mechanical, Electrical and Instrument works such as vessels, pumps, electrical panels, etc. STX/SOC 2018 2019
43 Installation of Piping and Pipeline ZFOD 2017 2020
44 Mechanical,Electrical,Insrtrumentationa and Piping works at Badra Oil Field Petrofac 2017 2020
45 1. Provisions of competent, experienced and a professional manpower and equipment/vehicle as further described in this scope of service to support:
• Pre commissioning
• Commissioning
• Maintenance
• Shutdown activities
• Scaffolding Services
Petrofac International (UAE) LLC . 2018 2020
46 Water Station supply & Installation Haione Ind Co.Ltd. 2020 2020
47 Water Pipeline for Water Station (Supply & Installation) Haione Ind Co.Ltd. 2021 2021
48 UG Utility Piping Work Hyundai Livert 2021 2021
Sr. No. Description of Works Client Start End
1 Installation of 132 kv GIS Substation At Washash Substation Washington Group Co. 2008 2008
2 Construction of Service & administrative Buildings for new Maysan refinery Maysan refinery 2009 2009
3 Construct of Baiji GasTurbine power plant 6x160MW sgt5-pack2000E siemense Ministry of Electricity 2012 2012
4 Construction of water treatment Unit with capacity of ( 2000m3/day ) at the SRC State Company for Industrial Design 2013 2014
5 Implementation of Water Treatment plant 10,000m3/h for Basra Sport City Ministry of Sports 2013 2014
6 Supplying and install 4 units of water treatment for Hay Al Hussain Water project in Basrah, capacity of each unit is 400 m3/h Basra Water directorate 2016 2016
7 Supplying and install 4 unit of water treatment for Shat Al Arab Water project in Basrah , each unit capacity is 400 m3/h Basra Water directorate 2015 2016
8 Rehabilitation of al garage pump station and construction the Administration buildings, Service buildings and generator room, Site works, Civil works for sewage collecting tank and Warehouse shed Basra sewer directorate 2015 2016
9 Supply material, equipment and labors to construct a complete packaged sewage treatment plant and standby generator suitable for a population equivalent of 50,000 people as in the design drawings and the specification Basra sewer directorate 2015 2016
10 The installation of 11KV, 22 KV and 33KV, substations. Our services also include CT, PT & LA, Isolators, gantries and towers JCCI/Babil 2016 2017
11 Installation of a new electrical network by: Supply & installation of an over head line 200 circular & 38 lattice steel poles. Supply & installation of 10 transformers (Capacity 250KVA) with accessories Mott MacDonald 2016 2017
12 Equipment's Installation of Liquefied Petroleum Gas Unit/ at the South Refineries Co South Refineries Company 2017 2017
13 Installation of Mechanical, Electrical and Instrument works such
1. Static Equipment Installation
2. Rotary Equipment Installation
3. Piping Installation
4. Valves Installation
5. Supports
6. NDT
7. Hydro-Test
8. Sand Blast
9. Painting
10. Flushing
11. Pre commissioning
12. Cable Installation
13. LV Transformer
14. ML Transformer
15. Electrical Equipment Installation
16. Electronic Equipment Installation
17. Power Panels
18. Power Generator Installation
Petrofac International (UAE) LLC . 2017 2018
14 First Commercial and Production (FCP) Garraf Oil and Gas project in Southern Iraq. The project includes the EPC of storage tanks and the construction of piping systems, process units, LP & ATM. The current FCP Garraf project is designed for 100kbpd oil from the Mishrif formation utilizing two (2) oil processing trains of 50 kbpd capacity each. Lakeshore Toltest Corporation 2017 2018
15 Design, Supply, Installation, Testing & Commissioning of Substation on Turnkey GE 2018 2018
16 Design and Engineering, Procurement, Construction and commissioning of Basrah Crude Distillation No.4 Unit , LPG Unit and Boiler TECHNOEXPORT 2018 2018
17 Electrical and Instrumentation Work (Cable laying, Cable tray & Cable support Installation, cable termination, Instrumentation Works) CCC/Shell 2018 2019
18 Installation of prefabricated steel structural buildings for LCR ,LER ,Gurd House and four guard towers each one consist of three stories. The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system. EMIL 2018 2019
19 Heat Excahnger Rehablitation Service Bp Iraq N.V 2017 2019
20 Installation of prefabricated steel structural building for LCR ,The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system EMIL 2018 2019
21 Providing various required Scaffolding along with required skilled manpower, Scaffolding materials. The scope will start from mobilization/ demobilization of skilled & experienced manpower, required scaffolding materials, equipments, tools & tackles to COMPANY site for erecting or dismantling of Scaffolding as per COMPANY Scaffolding procedures and permit requirements and the types of scaffolding is including but not limited to the following :
1. Supply and install Tube and Coupler cantilever scaffolding type.
2. Supply and Install Tube and Coupler suspendable scaffolding Type.
3. Supply and install Tube and Coupler mobile Scaffolding type.
4. Supply and install Tube and Coupler Tower scaffolds type.
Bp Iraq N.V 2018 2019
22 Installation of Mechanical, Electrical and Instrument works such as vessels, pumps, electrical panels, etc. STX/SOC 2018 2019
23 Electrical Infrastructure Installation ExxonMobil 2019 2020
24 Installation of Piping and Pipeline ZFOD 2017 2020
25 Mechanical, Electrical, Instrumentation and Piping works at Badra Oil Field Petrofac 2017 2020
26 1. Provisions of competent, experienced and a professional manpower and equipment/vehicle as further described in this scope of service to support:
• Pre commissioning
• Commissioning
• Maintenance
• Shutdown activities
• Scaffolding Services
Petrofac International (UAE) LLC . 2018 2020
27 Water Station supply & Installation Haione Ind Co.Ltd. 2020 2020